Demolition Projects

Our Industry today is as much about separating, sorting and recycling as it is about demolition. Our recent projects have been really good examples of this with almost every material having its own method of disposal or recycling to specialist waste and material handling sites throughout the UK.

 

BETAFENCE Works – Sheffield

 

Buildings of all shapes, sizes and construction cover the 14 acres of industrial works at BETAFENCE and present us with many challenges. Not least making the project self financing and showing our client a profit from the estimated scrap yield of 6000 tons.

 

The Jarvis Porter Building – Hinkley

 

The wide expanse of this huge packaging warehouse with its significant M+E in the roof voids proved the perfect environment for our Demolition Spec’ Excavators fitted with specialist attachments.

 

Glenway Products - Wigston

 

All windows were removed prior to the demolition to prevent broken glass showering neighbouring properties. Due to the close proximity of these residential properties it was important that the control of dust was also forefront in our minds.

 

Forward Signs – Ilkeston

09.Ward-Demolition-Forward-Ilkeston during demolition (1)
10.Ward-Demolition-Forward-Ilkeston during demolition

 

Demolishing Forward Signs on Station Road Ilkeston was particularly challenging as half the building was to be retained and remained occupied. We had to operate in very tight confines throughout.

 

3M Factory – Loughborough

11.Ward-Demolition-3M-Factory before demolition
12.Ward-Demolition-3M-Factory during demolition

 

The former 3M factory on Wharncliffe Road, Loughborough was an interesting project as it was adjacent the famous and historical Great Central Railway. It was also the first project for one of our new demolition spec Volvo excavators.

 

McVities Biscuit Works – Ashby-de-la-Zouche

2.Ward Demolition-McVities factory foundations

 

We achieved heavy demolition adjacent residential properties at McVities with the minimum of disruption. The foundations at McVities proved formidable! This had to be thorough down to five metres below slab level and had a contract value close to half a million pounds.

 

Dunn Line Bus Depot – Nottingham

1.Ward Demolition-The Dunn Line Bus Station
2.Ward Demolition-The Dunn Line Bus Station

 

There had been a works on the site of the Dunn Line bus depot for over a century.

 

Gooch Autos – Nottingham

1.Ward Demolition-Gooch Autos Nottingham before demolition
2.Ward Demolition-Gooch Autos Nottingham after demolition

 

Before and after photos of the demolition and clearance work at Gooch Autos.

 

Beedles Lake Golf Club – Nottingham

 

A tricky venture at Beedles Lake Golf Club, where Ward Demolition dismantled a large conservatory while the new build continued above us.

 

Providing Demolition Solutions for the Construction Industry

 

For more information or enquiries about our demolition services
please contact us at A Ward & Sons Ltd by telephone or email.